Arrival |
|
|
27
Jan 2010
Much to our surprise, we
received the wheels today via UPS - 3 weeks in advance
of the car. Way to go FFR!
|
 |
|
 |
|
29 Jan 2010
The
Roadster frame dolly is
getting reused. In between FFRs, it was used to hold the body of drag truck
built by my son in law and later a jet ski, so this will
be the 3rd car built on it. I tried some Harbor Freight
wheels on it, but they did not roll very well.
|
 |
|

|
|
|
| 15 Feb
2010 The car
arrived ahead of schedule - it was scheduled to be
here on the17th. Kudos to Scott and
Stewart Transport, the weather in the south was terrible
with many roads iced over and closed. No pictures,
it was snowing with 25 degree temperatures and the
roads were slick, so pictures were not high on our list.
I do have one picture to
share, see it does snow in Alabama, it was taken
this morning in my backyard. |
|
|
 |
| 21 Feb
2010 Body
bucks, look gruesome, but work well. |
   |
| Inventory
Much to my surprise,
there were many parts backordered, fuel cell, heat and
air, radiator, seats, front LCAs, side pipes, shocks, the list goes
on. I thought the number of boxes looked a little light
for a complete kit. I only received half the car! In the past FFR has always
made good on the backorders, I just hope I don't have to
wait too long. |
_small.jpg) _small.jpg)  |
|
 |
| 22 Feb
2010 -
Backordered fuel fell arrived, along with the seats,
LCAs, and shocks 26
Feb - 2010 - Received backordered exhaust pipes, door
frames, AC components, and hatch frame. |
 |
|
 |
| 27 Feb
2010 The body gets wiped down
with fiberglass clearer to remove the mold release and
the frame sprayed with rust preventative before starting
any fabrication or assembly. |
  |
| Frame on the
dolly . |
 |
| A very tight
fit. The roadster is supposed to go on top, but this
will have to do for now.
Next step - sway
bars. |
  |
|
|
|
|